RESILIENT TECHNOLOGY PARK at I-20/Greenwood Road



Address Near 7340 Greenwood Road, Shreveport, LA, 71119
City Shreveport
State
LA State Resources/Incentives
County
Caddo Parish


Type Commercial
Additional Land 254
Sq. Ft. Available
Loading Docks
Ceiling Height
Number of Floors
On Site Parking
Nearest Interstate US-79
Miles to Interstate 0.4 Miles
Rail Yes
Nearest Airport Shreveport Regional (SHV)
Miles to Airport 4.5 Miles
Sprinklered
Natural Gas Yes
Municipal Water Yes
Municipal Sewer Yes
Electric Available Yes
Sale or Lease Both


Contact Name Dennis Shea
Contact Title President
For More Info NCDemo
Web Address www.fastfacility.com
Contact e-mail shaundonnelly45@gmail.com
Print/Email page

Disclaimer: FastFacility makes no guarantees as to the accuracy, timeliness, or completeness of this information. FastFacility accepts no liability for any loss arising howsoever from the use of the information contained herein. FastFacility is not acting as a real estate broker and presents this material "as is." If you have any questions regarding this policy, please contact dshea@fastfacility.com


Formerly 313 Acres/Currently 254+ acres located in west Shreveport at the intersection of I20, Greenwood Road (US Hwy79/80) and Bert Kouns Industrial Loop (La. 562), with direct access from I20 via Exit #8 (Bert Kouns Industrial Loop)..(May 2024).RTP is a 254+Acre Park Primed for Development comprised of two tracts of 155+/ acres and 81+/ acres.RTP is the Louisiana Economic Development Certified Site Formerly Known As I20/Greenwood Road.RTP is a American Electric Power (AEP)/McCallum Sweeney Consulting Certified Quality Site.RTP is The Home of the only Louisianabased AEPSWEPCO Transmission Control Center (Operational Q2 2024).RTP is an AT&T Certified FiberReady Site.RTP is Zoned I1 (PUD) (Light IndustrialPlanned Unit Development).Approximately 90 Acres of RTP was Cleared and Grubbed Completed May 2021.Future Redundant Electric Power Available (AEPSWEPCO).Redundant Fiber Optic Communications Available (AEPSWEPCO and AT&T Under Construction 12/2023).OnSite Water and Sewer Service Provided by the City of Shreveport.West Access Via Future Resilient Way 3Lane Roadway .East Access Via Future North Bert Kouns 4Lane Roadway.