|
Capable of supplying up to 7,000,000 gallons of water per day, as well as processing up to 5,700,000 gallons per day of sewage through its on-site treatment plant. Rail service from Conrail with seven tracks directly into the facility. On-site 6MW co-generation system with 200,000 pph pulverized coal boiler rated at 650 psig. Process steam available @240,000 pph at 120 psig. Raw material (grain, malt, corn, etc.) unloading (vacuum) system and storage silos.
|